HOW THESE SITES WERE CHOSENTown Staff identified and evaluated a range of potential sites across the community based on baseline criteria such as size, location, and access. After evaluating a total of eight sites in detail, the FS1 Steering Committee selected three as the most feasible options based on the operational needs and size requirements of a modern fire station.
These locations have been chosen and evaluated based on the following criteria:
Logistics
Impact on current fire operations, Town Meeting, and purchase approval requirements, lot size, and other construction concerns.
Ability to meet programmatic needs and accommodate station facilities, including front-line apparatus, a Maintenance Bay, and drive-through bays.
Site Viability
Level of direct access to High Street, response time from the property, and potential disruptions to vehicle and pedestrian traffic.
Access
Site topography, environmental constraints, access to existing utilities, and impact on town fields, recreation, and open spaces
Lot Restrictions
Site OneExisting Fire Department
Rebuild Fire Station 1 on the existing lot at 637 High Street.
Site Details
Challenges1.02 Acres
Lot SizeDirect access to High Street
No property purchase required
Minimal disruption to pedestrian and vehicle traffic
Minimal impact on town fields and recreation/open spaces
Access to existing utilities (water, electric, etc.) in place
Location is familiar to the Town and residents as a Fire Station
BenefitsRequires temporary fire operations during construction
Lot size inadequate to accommodate drive-through bays
Less conducive to housing maintenance bay, front line apparatus, and training space
Less desirable lot topography
Site limits potential expansion in the future if needed
Site Two72 Deerfield Avenue
Build new facility and relocate Fire Station 1 operations to lot on Deerfield Avenue.
Site Details
7.5 acres
Lot SizeDoes not require off-site temporary fire operations
Highly accommodating to front line apparatus, training spaces, maintenance bay, and drive-through bays
Access to existing utilities (water, electric, etc.) in place
Minimal lot restrictions
Offers multiple vehicle access to and from station (may impact response times)
BenefitsAccess road from property to High Street needs to be evaluated
May requires selective demolition to the existing Deerfield school
Limited access to existing utilities (water, electric, etc.) in place
Reduces access to town fields and recreation/open space
Challenges
Site ThreeParcel 14-131
Build new facility and relocate Fire Station 1 operations to town-owned property behind 736–738 High Street.
Site Details
5 acres
Lot SizeHighly accommodating to front line apparatus, training spaces, maintenance bay, and drive-through bays
Does not require off-site temporary fire operations
Minimal impact on town fields
Minimal lot restrictions
BenefitsAccess road from property to High Street needs to be evaluated
Could require Town Meeting approval for purchase of property to access High Street
Reduces access to nearby recreation areas and trails
Single road access to High Street
Challenges